Ready to explore the vibrant harbour city of Rotterdam? The best way to get there is by train, whether you opt for the cheaper EuroCity train, for the brand new Eurocity Direct or for the high speed Eurostar train. With SNCB International, you can choose between all of them!
Due to engineering works on the Dutch rail network, the EuroCity (Brussels-Rotterdam) and Eurocity Direct (Brussels-Amsterdam) trains will be diverted via Roosendaal on Saturday 15 and Sunday 16 November 2025, resulting in longer journey times.
EuroCity trains will only operate between Brussels and Breda (instead of Rotterdam) and will not serve the station of Noorderkempen. Substitution buses will shuttle between Breda and Noorderkempen.
From Saturday 15 November to Tuesday 9 December 2025, engineering works will be carried out in the rail tunnel south of Brussels Airport-Zaventem rail station. During these works, the number of trains to and from the airport will be significantly reduced.
Due to planned engineering works on the dutch rail network, the EuroCity (Brussels-Rotterdam) and Eurocity Direct (Brussels-Amsterdam) trains will be diverted via Roosendaal on Saturday 29 November and Sunday 30 November.
Consequently, their route will be restricted as follow:
From Breda or Rotterdam, you can use onward trains operated by NS (Dutch railways) to your final destination in the Netherlands.